CHEMICAL BOLTS ATLAS ATR 5.8 M12x160

CHEMICAL BOLTS ATLAS ATR 5.8 M12x160

Atlas ATR 5.8 M12x160 chemical bolts, durability level 5.8, consist of two main parts: the M12x160 bolt part and the chemical part. The product is used in installing column legs, installing steel beams, installing emergency stairs, installing lobby roofs (canopy roofs),...

  • 425
  • Contact us

DESCRIPTION OF CHEMICAL BOLTS ATLAS ATR 5.8 M12x160:

Atlas ATR 5.8 M12x160 chemical bolts with durability level 5.8 include 2 main parts

The M12x160 bolt part includes a bolt body with a diameter of 12mm and a length of 160m + 1 nut + 1 flat bolt, which can be added as required. The bolt body usually has a hexagonal head, the other end is cut into a V shape and has a notch in the middle. Electrolytic galvanized bolts have a durability level of 5.8
Chemical section. You can use chemicals in bottle form using a pump gun or M12 capsule chemicals
 

APPLICATIONS OF ATLAS ATR 5.8 M12X160 CHEMICAL BOLT:

Install railings
Installing glass facades and stone facades
Install steel column legs and steel beams
Install canopy roof. Roof lobby
Install emergency stairs
Install ventilation fans
Fix the foot of the shelf.
Fixing pipes in high-rise buildings or factories, hospitals, schools,...
Install the tripod
 

CONSTRUCTION ACTION OF ATLAS ATR 5.8 M12X160 CHEMICAL BOLT:

Step 1: Drill a 14mm hole, 110mm deep in the concrete
Step 2: Use a brush and dust blower to clean the bore
Step 3: Pump chemicals into the borehole (If the chemical is in bottle form, use a pump gun) or place the capsule into the borehole (if the chemical is in capsule form)
Step 4: Insert the threaded rod into the drill hole so that the chemical flows out to the mouth (If the chemical is in bottle form, use a pump gun) or drill the threaded rod to break the capsule (If using chemicals in capsule form. The threaded rod is connected to the drill via a connection tool and drilled to break the capsule)
Step 5: Wait for the chemical to set and then install the load. Normally, if you use capsule chemicals, the time for the chemicals to set to maximum load is 30-45 minutes. If you use epoxy chemicals in bottle form using a pump gun, the average time to reach maximum load is 8 hours.
 

ATLAS ATR 5.8 M12x160 LEVEL CHEMICAL BOLT FORCE SPECIFICATIONS:

Traction force: 20KN corresponding to a weight of 2 tons
Cutting force: 20KN corresponding to a weight of 2 tons
The above parameters are recommended when used with C20/25 basic concrete

Share:

related products